Why construction projects lose control.
Projects rarely fail in one dramatic moment. They drift one undocumented decision at a time.
The common drift pattern
Scope assumptions are not captured. Decisions stay in email. Schedules do not reflect field conditions. Cost exposure is discussed but not tracked. Everyone is working, but no one has one clear control view.
The fix is not another meeting. The fix is a structure that turns information into decisions.